|

-
Chemical Clean: Horn is inspected and disassembled; moderately stuck slides are removed; all parts are cleaned to remove corrosion; mouthpiece is sterilized; tuning slides are lubricated; slide and valve action and alignment are checked; felts and corks are replaced, springs are replaced as necessary.
-
Lead Pipe Replacement
-
Dent Removal
-
Braze (Silver solder)
-
Solder (soft)
-
Valve Casing Adjustment
-
Bent Valve
-
Water Key Spring replacement
-
Amati Water Key Installation
-
Pull Stuck Slides
-
Trombone Slide Action
-
Honing Trombone Slide
-
Trombone Slide Crook replace
-
Replace T-Bone Inside Slide
-
Replace T-Bone Outside Slide
-
Solder Sousa Branch
-
Sousa Dent Removal
-
Restring Rotary Valve & Spatula Adjustment
-
Rotary Valve Adjustment (swedge back bearing plate, and front bearing)
|